40 ft Air-Cooled 1.2 MW Container
40 ft Air-Cooled Mining Container — 1.2 MW, Ready in Prague A finished, factory-tested mining container sitting in our Prague yard right now. Skip the 25–30 day China build and 4–6 weeks of ocean freight — reserve it, inspect it powered up, and drive it out the next day. 1.2 MW Power capacity ~380 Miner slots 0 days Lead time 40 °C Hot-climate rated 365 d Electrical warranty Overview Energy-ready, the day you collect it This is a complete, plug-and-play 40 ft High-Cube container engineered for dense air-cooled mining in hot climates. It arrives fully wired and factory-tested, with the transformer feed, distribution, cooling and monitoring already built in. You bring the miners and the power — it does the rest. Because the unit is physically in Prague, there is no production queue and no shipping wait: the most expensive thing in mining is downtime, and this removes weeks of it. The differentiator Cooling that holds full hashrate in the heat Airflow Negative-pressure exhaust array Heavy-duty fans (16 × 1.1 kW, ~39,000 m³/h each) pull filtered air straight across the machines — the proven layout for high-density air cooling, sized for the full 1.2 MW load. Evaporative Water-curtain pre-cooling A front wet-wall drops intake-air temperature several degrees on the hottest days. At a 34–40 °C ambient that is the difference between thermal throttling and sustained full hashrate. Layout Isolated hot / cold aisle Partitioned sides keep cool intake and hot exhaust from ever mixing, configured for the specific miner you run. Security CCTV & environmental sensors Internal and external cameras plus temperature and humidity monitoring give you 24/7 remote eyes on the site. Specifications Full spec sheet Container type 40 ft High-Cube, air-cooled Power capacity ≈ 1.2 MW Miner slots ~380 (multi-tier racking) Transformer feed 1,200 kVA via 4 feeder cables Main protection 4 × 630 A main circuit breakers (one per feeder) Distribution voltage 240 V per phase (3-phase, 4-wire) PDUs 80 A units, output matched to miner (C19 / P33 3-phase) Cooling Negative-pressure exhaust fans + evaporative water curtain Climate rating Designed for 34–40 °C ambient Enclosure Galvanized steel, IP54 weatherproof Monitoring CCTV cameras + temperature/humidity sensors + alarms Networking Switches and structured cabling included Warranty 365-day electrical warranty Location / lead time Prague, Czech Republic — collect the next day In the box What's included Container with negative-pressure exhaust fan array and evaporative water curtain Isolated hot/cold aisle, configured for the selected miner 1,200 kVA transformer feed, 4 × 630 A main breakers, PDUs and full distribution CCTV camera system and environmental sensors with alarms Network switches and structured cabling Factory-tested and fully wired, ready for commissioning Capacity How many miners it holds With ~380 physical slots, the 1.2 MW supply is the practical limit at Antminer S21-class power draw — not the rack. Approximate counts per container: Model Hashrate Efficiency Power Max @ 1.2 MW Recommended* Antminer S21 Pro 234 TH/s 15.0 J/TH 3,510 W ~341 ~285 Antminer S21 XP 270 TH/s 13.5 J/TH 3,645 W ~329 ~274 Antminer S21+ 235 TH/s 16.5 J/TH 3,878 W ~309 ~258 * For sustained 40 °C peaks we recommend filling to ~1 MVA to leave cooling headroom. Final loading is tuned at commissioning. Add hardware Ship miners with the container We stock the latest Antminer S21 series and can dispatch them with your container. Integrated PSU included, 12-month warranty, bulk pricing at container scale. S21 Pro Best price/efficiency balance Hashrate234 TH/s Efficiency15.0 J/TH Power3,510 W Connector220–277 V · C19 S21 XP Most hashrate, coolest per TH Hashrate270 TH/s Efficiency13.5 J/TH Power3,645 W Connector220–277 V · C19/C20 S21+ Lowest entry cost Hashrate235 TH/s Efficiency16.5 J/TH Power3,878 W Connector380–415 V 3-ph · P33 Why buy from stock In Prague, not in transit No 25–30 day China production — the unit already exists; the queue is behind you. No 4–6 week ocean freight — skip the ship, the port and the customs wait. Inspect before you pay the balance — see it powered up in our yard before committing. EU-based supplier — reachable, accountable, and easy to coordinate with. Collect the next day — arrange your transport, or we'll help line it up. Ordering How it works Reserve with a deposit 50% deposit locks the unit and today's pricing. First deposit takes it. Inspect & settle balance See it running, confirm, pay the 50% balance by bank wire or crypto (USDT / BTC). Collect — next day Load it and go, with handover notes and commissioning guidance. Pricing is locked on deposit — the hardware market moves daily. Request today's rate for this unit and any miners you'd like shipped with it. Questions FAQ Is it really collectable the next day? Yes — it's a finished, factory-tested unit in our Prague yard. Once your deposit clears we schedule collection for the following day. The roof fans and water curtain are fitted during a short 1–2 day commissioning at your site. What does it cost? Container and hardware pricing tracks the crypto market and moves daily, so we lock your price the moment a deposit is received. Message us for today's figure. How many miners does it hold? ~380 physical slots; at S21-class power the 1.2 MW supply is the limit — roughly 258–341 machines depending on the model. We size it to whatever you run. Can I add miners to the order? Yes. S21 Pro, S21 XP and S21+ are in stock and can ship with the container. PSU included, 12-month warranty, bulk pricing at scale. What about transport and power hook-up? Collection is from Prague; we can recommend hauliers and help coordinate loading. Grid connection and the medium-voltage supply are arranged on your site. One unit. In Prague. First deposit collects it. In stock now · ready the next day Reserve this unit →
Variants (1)
- Default Title — 45148.00 USD — In stock
AI Readiness
Good foundation, but some important product data is still missing.