Custom body — additional section
Surcharge line added by the 3D tower configurator when a bridge body is longer than one 10 ft tube section (max 120 in per section): the body is built in 2 equal sections (3 above 240 in) joined by a flange pair. 2nd section — the second body section and its junction. 3rd section — the third section and its junction. Not sold on its own: the tower it belongs to is named in the line properties.
Specifications
- Section
- 2nd section, 3rd section
Variants (2)
- 2nd section — 327.00 USD — In stock
- 3rd section — 164.00 USD — In stock
How AI sees this product
The more complete this product's details, the more confidently AI assistants can understand and recommend it.
76%