MODERN PENTATHLON SET – SIZE XL
Engineered for elite preparation and uncompromising standards, this training structure is designed in full alignment with the official guidelines of the Union Internationale de Pentathlon Moderne (UIPM) and based on the current UIPM competition equipment catalogue, from 2025. Questions? Want to know the price? Click the ‘whatsup’ icon visible in the bottom right and talk with us live or email us shop@toroz.eu Built for clubs that train seriously — and athletes who compete to win — this structure delivers professional-level conditions with structural integrity and modular precision. Dimensions Width: Length: 6,1 m Height: 3.3 m The proportions reflect official competition requirements, allowing athletes to train in conditions that replicate real event settings. The structure features four independent training lanes, each configured according to UIPM dimensional standards: Spinning wheels (x4) Flying Hoops (x3) Swinging globes (x8) Tilting ladder (x3) Composite rings (x6) Cliffhanger Boards (x3) It is possible to modify and change to other tracks. All obstacles are mounted using standard scaffolding clamps included in the set. This solution ensures structural stability while allowing precise obstacle spacing in accordance with UIPM specifications and modifications. Built for Demanding Environments With a total height of 330 cm, the structure is designed to operate with a 20 cm safety landing mat, as required by UIPM guidelines. To provide a complete solution, we offer: Custom-sized landing mats tailored to the structure Dedicated protective pole covers engineered for a perfect fit Every element is designed to create a controlled, competition-ready environment while maintaining durability under intensive training loads. Intended Use & Positioning This structure is developed for: Sport clubs and gyms Performance academies Private training facilities Home gyms / gardens Due to its technical configuration and catalogue-based construction concept, this structure is not intended for public-space installation. Installation Recommendations Due to its height, the structure may exhibit slight movement during use. This natural flex does not affect its functionality or performance. The support columns are equipped with base plates featuring four mounting holes, allowing the structure to be securely anchored to the ground surface (optional) for increased stability. You can order custom-made mattresses and platforms in accordance with UIPM guidelines Production time: 30-45 days. Delivery arranged individually.
Specifications
- Number of tracks
- Double-sided, One-sided
How AI sees this product
The more complete this product's details, the more confidently AI assistants can understand and recommend it.