Overstort / ontluchtingsput 110mm
This overflow and ventilation pit is placed at the end of the infiltration system to manage overflow and provide ventilation. The top should be 2 to 3 cm above the ground level.
Variants (1)
- Default Title — 59.99 EUR — In stock
AI Readiness
Good foundation, but some important product data is still missing.
83%