Montage für Fußboden für Sockelmaß 4,00m x 3,28m
In stock
View at Merchant
This building set includes foundation top edges and requires installation within Germany. Installation by the company's team will occur 1-4 weeks after delivery. The construction site must be accessible and have a flat, load-bearing foundation. A 230V power supply and space within 10 meters of the foundation are necessary. The customer must check for completeness and visible damage before the scheduled installation. Additional costs for re-delivery due to unreported issues will not be covered.
Variants (1)
- Default Title — 0.00 EUR — In stock
AI Readiness
Good foundation, but some important product data is still missing.
56%