Kentino AI Node A100 — 8× NVIDIA A100 SXM4 80 GB, 640 GB HBM2e
Kentino AI Node A100 640 GB HBM2e, NVSwitch-Pooled 8x A100 SXM4 80 GB | 4,992 INT8 TOPS 640 GB HBM2e pool 2.04 TB/s per-GPU bandwidth 600 GB/s any-to-any NVLink 3.2 kW GPU draw The only node tier with a sane cost per gigabyte of VRAM. An 8-GPU node carrying eight NVIDIA A100 SXM4 80 GB modules on an NVLink/NVSwitch baseboard: 640 GB of HBM2e at 2.04 TB/s per GPU with 600 GB/s any-to-any GPU bandwidth. Ampere is two generations back, and for a large class of work that is exactly why you want it - the same 640 GB pool as a Hopper H100 node, at substantially less money and 2.4 kW less heat. If your models run at bf16 or Q4 and you are not going to use fp8, you should not be paying for it. Hardware Component Detail GPUs 8x NVIDIA A100 SXM4 80 GB HBM2e (Ampere, 400 W per module) VRAM pool 640 GB HBM2e, NVSwitch-pooled Memory bandwidth 2.04 TB/s per GPU GPU interconnect NVLink 3 via NVSwitch, 600 GB/s any-to-any Compute 2,496 TFLOPS bf16 dense | 4,992 INT8 TOPS. No fp8 tensor path CPUs 2x AMD EPYC 7643 (Milan, 48C/96T each) on the Supermicro AS-4124GO-NART+ platform System memory 1 TB DDR4-3200 ECC RDIMM (16x 64 GB) Storage 2x 1.92 TB U.2 NVMe boot + 2x 3.84 TB U.2 NVMe data Networking 2x NVIDIA ConnectX-7 400 Gb/s Chassis 4U rack-mount, front-to-back airflow, 24/7 rated Power 4x 3000 W redundant What it runs 640 GB at bf16 and Q4 covers most production serving and fine-tuning. Estimates are for this 8-GPU configuration with tensor parallelism. Component Detail Llama 3.3 70B / Qwen3-72B bf16 full precision. ~35-50 tok/s single stream, 1,500+ tok/s batched Qwen3-235B-A22B MoE Q4 across the full 640 GB pool Mistral Large 2 123B Q4-Q8 with context headroom QLoRA / full fine-tune 70B 8-way tensor parallel, NVSwitch-backed Classic HPC 9.7 TFLOPS FP64 per GPU - 77.6 TFLOPS FP64 per node Multi-tenant serving several 30B-70B models resident at once Throughput figures are estimates derived from published vendor specifications and community benchmarks for this GPU generation, not measurements taken on this exact configuration. We will give you measured numbers for your model and context length before you commit. Power and cooling Roughly 4.3 kW sustained: 3.2 kW of GPU plus CPU, fans and storage. That is 2.4 kW less than a Hopper node and it is the practical selling point - 4.3 kW fits a conventional datacentre rack with front-to-back airflow and no aisle containment retrofit. Over three years at EU industrial electricity rates the difference against an H100 node is a real line in the TCO, not a rounding error. What you give up, and export control No fp8. Ampere predates the format. Models shipping fp8-native - the DeepSeek-V3 family, Hunyuan-Large - run here at bf16 or Q4 instead, which costs VRAM and throughput. If your roadmap is fp8 checkpoints, buy Hopper. This is the single real limitation of the tier and we would rather you hear it now. Export control. A100 80 GB is above the Advanced Computing Item thresholds (ECCN 3A090.a), so it needs the same KYC form and End User Certificate as the Hopper nodes. Late-life hardware. Ampere is near end of channel life. Warranty horizon and spares availability are shorter than on current generation, and we will tell you exactly what we can commit to in writing before you order. We do not charge you for any of this. Screening, the paperwork and the filing are part of the price - there is no compliance fee and no surcharge. What it costs you is time, not money. No clearance, no shipment. There is no version of this where the hardware leaves our hands before the check is complete. We will tell you where your file stands at each step rather than leaving you to guess, and we will tell you early and plainly if it looks like it will not clear. What you get from Kentino Kentino supplies, configures and supports this node as a complete deployment: rack and power design against your site's actual feed, front-to-back airflow sizing for 24/7 operation, OS and driver stack (Ubuntu with pinned NVIDIA driver, CUDA, container toolkit), the inference or training stack of your choice, burn-in with a written report, EU-based logistics and warranty. We also handle the export paperwork with you rather than mailing you a form and hoping. That part takes longer than the hardware and is where most first-time buyers of this class of machine get stuck. Price shown is EUR excluding VAT, EXW Prague (Incoterms 2020). Collection, freight, insurance and any destination import duties are for the buyer’s account. Lead time on request. Tell us the models you need to serve and we will tell you honestly whether this node or a Hopper node is the right purchase - the answer is genuinely sometimes this one. Restricted territories. We do not sell or ship to territories subject to European Union, United States or United Nations sanctions or embargoes, and we cannot supply any person or entity named on an applicable restricted-party list. We screen the buyer and the end user against those lists immediately before every dispatch.
Variants (1)
- Default Title — 296026.00 EUR — In stock
How AI sees this product
The more complete this product's details, the more confidently AI assistants can understand and recommend it.