Waqaf Solar-Powered Borehole  (Telaga Air)

Waqaf Solar-Powered Borehole (Telaga Air)

Brand: MV-ICF
SKU: MV26-SOLARPUMP-LOT
400.00 SGD In stock Buy at Merchant

Each Solar-Powered Borehole costs $8,000 to construct. Geophysics Survey Digging of borehole (60-90m) Solar Submersible Pump x 1 Solar Panels x 4 Solar Cables Piping and Plumbing Materials Metal Tower x 1 Plastic Water Tank x 1 Water Basin with Tiles x 1 Water Pipes x 5 Signboard with Metal Stand 1 Solar-Powered Borehole = 20 Waqaf Lot 1 Waqaf Lot = $400 (1 Donor's Name) The construction will commence in August 2026 and will be completed by September 2026. Insya Allah. Once the project is completed and commissioned, photos and certificates (softcopies) will be sent to you via WhatsApp, PM, or email (whichever is your preference) within 1-2 weeks. ---------------------------------------------------- COMPLETED WATER PROJECT IN NIGERIA (PHASE 1) ❤ Handpump 1 - Anguwan Sarkin Fulani Photo: https://www.facebook.com/media/set/?set=a.2367762053365721 Video: https://www.facebook.com/watch/?v=972203240101508 ❤ Handpump 2 - Gyallesu Photo: https://www.facebook.com/media/set/?set=a.2390526224422637 Video: https://www.facebook.com/watch/?v=513246660457397 ❤ Handpump 3 - Angwan Biso Photo: https://www.facebook.com/media/set/?set=a.2390528027755790 Video: https://www.facebook.com/watch/?v=391408116202953 ❤ Handpump 4 - Hayin Dogo Photo: https://www.facebook.com/media/set/?set=a.2408321269309799 Video: https://www.facebook.com/watch/?v=733561004465673 ❤ Motorised 1 - Hayin Digga Photo: https://www.facebook.com/media/set/?set=a.2401624313312828 Video: https://www.facebook.com/watch/?v=323904953159307 ❤ Motorised 2 - Angwan Na Barandi Photo: https://www.facebook.com/media/set/?set=a.2408322622642997 Video: https://www.facebook.com/watch/?v=281993654056494 ❤ Motorised 3 (Shared) - Filin Holo Photo: https://www.facebook.com/media/set/?set=a.2439682046173721 Video: https://www.facebook.com/watch/?v=1025544188077430 ---------------------------------------------------- COMPLETED WATER PROJECT IN NIGERIA (PHASE 2) Videos : Click here to watch all the videos Photos : Click on the link below ❤ Motorised @ Layin Bangis ❤ Motorised @ Layin Baban ❤ Motorised @ Layin Bursar ❤ Motorised @ Mangwarori Muchiya ❤ Handpump @ Yandaka ❤ Handpump @ Angwan Sarki ❤ Handpump @ Layin Idi Dan Kwakwa ❤ Handpump @ Angwan Kanawa ❤ Handpump @ Gidan Na Ruma ❤ Handpump @ Angwan Fulani ❤ Handpump @ Gidan Sarkin Dangi ❤ Handpump @ Gidan Alhaji Kangimi ---------------------------------------------------- Why is the cost of constructing the hand pump borehole higher than other countries in Asia? This cost is determined by the cost of materials in Nigeria, the difficulty in transporting these materials into remote areas, and the heavy equipment needed to drill deeply (usually between 60m-90m), often through rocky soil. The project cost includes necessary administration, marketing, operational, and overhead expenses to ensure the project is implemented efficiently and sustainably. Insya Allah we will accomplish this amanah with the assistance of our trusted partner in Nigeria, Isah Chikaji Foundation (ICF). If you need any clarification, please contact us. Thank you.

Variants (1)
  • Default Title — 400.00 SGD — In stock

AI Readiness

Good foundation, but some important product data is still missing.

81%