Water pump Pentax 1 hp with smarthead CAM100N/00
125 V Made in Italy 166 L/ min max 10 bar inlet/ outlet 1" Safety system avoids dry running operation Pump working LED (on) 12 months limited warranty Starting: 1. Be sure that the pump is correctly primed, then gently open one tap of the installation. 2. Connect the device to the electric supply, the tensionled will lit (Power). 3. The pump starts working automatically, and within 20-25 seconds the pressure will reach approximately the maximum pressure provided by the pump. During its working, the corresponding LED (on) will be on. 4. Close the tap indicated on point 1. After 10-12 seconds, the pump will stop. The tension LED (power) will be the only one to remain on. Any problem after this procedure will be due to a defective pump priming.
Variants (1)
- Default Title — 1995.00 TTD — In stock
AI Readiness
Good foundation, but some important product data is still missing.