BIRMINGHAM Hangar bois Ouvert MODELE ECO / 2 pans 6.0 x 15.17m 25° de pente / Livraison OFFERTE
This building is designed for up to 600 meters above sea level. It requires 8 to 12 weeks of manufacturing time. The structure is made of treated pine or optionally autoclaved brown pine, suitable for eco-friendly applications but not for future enclosure. It can accommodate solar panels and is intended for DIY enthusiasts and professionals.
- The description claims that the building is designed for up to 600 meters above sea level.
- The description claims that the building requires 8 to 12 weeks of manufacturing time.
- The description claims that the structure is made of treated pine or optionally autoclaved brown pine, which will turn brown and protect against weather for about 5 years.
- The description claims that the building can accommodate solar panels and is not suitable for future enclosure.
Specifications
- Traitement
- Incolore classe 2, Autoclave brun classe 3
- Livraison
- Livraison OFFERTE FRANCE METROPOLITAINE ! (sous réserve d'accessibilité semi-remorque)
Variants (2)
- Incolore classe 2 / Livraison OFFERTE FRANCE METROPOLITAINE ! (sous réserve d'accessibilité semi-remorque) — 8580.00 EUR — In stock
- Autoclave brun classe 3 / Livraison OFFERTE FRANCE METROPOLITAINE ! (sous réserve d'accessibilité semi-remorque) — 9780.00 EUR — In stock
AI Readiness
Good foundation, but some important product data is still missing.
83%